Q
QuestionArchitecture

"What are the four basic types of threaded fasteners? A. Hex Bolts, Machine Screws, Lag Screws, Wood Screws B. Hex Bolts, Sheet Metal Screws, Self-Tapping Screws, Lag Screws C. Nuts, Bolts, Washers, Threaded Rods D. Hex Bolts, Hex Nuts, Flat Washers, Lock Washers"
29 days agoReport content

Answer

Full Solution Locked

Sign in to view the complete step-by-step solution and unlock all study resources.

Step 1
: Identify the types of threaded fasteners mentioned in the options.

There are four types of threaded fasteners listed in each option. We will examine them one by one to determine which one is correct.

Step 2
: Analyze the first type of threaded fastener in Option A: Hex Bolts.

Hex bolts are threaded fasteners with a hexagonal head and machine screw threads. They are used to secure two or more parts together and are designed to be tightened or loosened using a wrench.

Final Answer

Therefore, the correct answer is Option A: Hex Bolts, Machine Screws, Lag Screws, Wood Screws.

Need Help with Homework?

Stuck on a difficult problem? We've got you covered:

  • Post your question or upload an image
  • Get instant step-by-step solutions
  • Learn from our AI and community of students

Related Questions

Architecture

25 days ago

How did flying buttresses help the primary goal of the Gothic architect?

·
View Answer

Architecture

25 days ago

Expansion of the ICS modular organization Is the responsibility of the?

·
View Answer

Architecture

25 days ago

"What did Louis Sullivan's designs emphasize? A. vertical lines using steel frames B. vertical lines using an open floor plan C. horizontal lines using an open floor plan"

·
View Answer

Architecture

29 days ago

The word "facility" contains the root "fac." What does the root "fac" mean?

·
View Answer

Architecture

29 days ago

"Which of the following is the correct sequence for installing a bifold door? A. Measure the opening, attach the track, install the pivot brackets, and hang the door. B. Attach the track, measure the opening, install the pivot brackets, and hang the door. C. Hang the door, attach the track, install the pivot brackets, and measure the opening. D. Install the pivot brackets, measure the opening, attach the track, and hang the door."

·
View Answer

Architecture

29 days ago

What is the most common mistake made when installing joist hangers?

·
View Answer