Army promotion Board 2021: Maintenance
This flashcard set provides essential information on Army maintenance procedures and motor pool operations, referencing key publications like DA PAM 750-35 and DA PAM 750-1. It includes the levels of maintenance, the meaning and timing of PMCS, and regulations guiding material maintenance and motor pool management.
What DA PAM is the guide for Motor Pool Operation?
DA PAM 750-35
Key Terms
What DA PAM is the guide for Motor Pool Operation?
DA PAM 750-35
What army regulation covers the army material maintenance policy?
DA PAM 750-1
What are the 4 levels of maintenance?
Unit
Direct support (DS)
General support (GS)
Depot
What does PMCS stand for?
Preventative maintenance checks and services
When is a PMCS required to be performed?
Before, during and after the operation of a piece of equipment and also weekly and monthly intervals
What is a TM?
A technical manual. It outlines the specific scope of repairs on equipment.
Related Flashcard Decks
Study Tips
- Press F to enter focus mode for distraction-free studying
- Review cards regularly to improve retention
- Try to recall the answer before flipping the card
- Share this deck with friends to study together
Term | Definition |
---|---|
What DA PAM is the guide for Motor Pool Operation? | DA PAM 750-35 |
What army regulation covers the army material maintenance policy? | DA PAM 750-1 |
What are the 4 levels of maintenance? | Unit |
What does PMCS stand for? | Preventative maintenance checks and services |
When is a PMCS required to be performed? | Before, during and after the operation of a piece of equipment and also weekly and monthly intervals |
What is a TM? | A technical manual. It outlines the specific scope of repairs on equipment. |
What is DD Form 314? | Preventative maintenance schedules and record |
What forms are contained in the equipment record folder when the vehicle is dispatched? | DA Form 2404 or 5988-E equipment inspection and maintenance worksheet |
Who is required to perform PMCS? | Every operator who is assigned a piece of equipment |
What does TAMMS stand for? | The Army Maintenance Management System |
A thorough vehicle dispatch process is necessary as part of a quality maintenance program, to ensure equipment is operationally ready before being dispatched and to establish an audit trail on operators and equipment. Every leader should follow and checks the dispatch procedures. The dispatch process is evaluated by getting answers what questions? | 1) is the dispatcher appointed on orders per DA PAM 738-750? |
Historic records are permanent records that show the receipt, operation, maintenance, modifications, transfer and disposal of equipment. These records assist commanders in maintaining equipment at the army maintenance standard of achieving mission assigned operationally ready rates. Some of the most frequently used historical records? | DA Form 2408-4 (weapon record data) |
What DA Form do you use to request for issuer turn-in? | DA Form 2765 |
What is the DA Form 2407 used for? | To request support maintenance on a piece of equipment |
What type of manual is used to perform operator level PMCS? | The operators manual (10 series) |
Before a vehicle can be dispatched, what safety equipment must be present? | Fire extinguishers (up to date inspection tags), complete first aid kit and highway warning kit |
What is a class 1 leak? | Seepage of fluid not great enough to form drops |
What is a class 2 leak? | Seepage of fluid great enough to form drops, but not great enough to cause the drops to fall during inspection |
What is a class 3 leak? | Seepage of fluid great enough to form drops and drip during inspection |
What does PLL mean? | Prescribed Load List |
How many days does a basic PLL sustain a unit? | 15 days |
What does the Acronym MAIT stand for? | Maintenance Assistance and Instruction Team |