Check equipment alignment to dock; must be flush to platform.
Ensure trailer is set up to take advantage of gravity feed.
Unload aids must be available & functional; totes, roller and proper unload stand.
Key Terms
Job Setup (3)
Check equipment alignment to dock; must be flush to platform.
Ensure trailer is set up to take advantage of gravity feed.
Unload aids must be...
When opening Overhead doors (10)
Grasp latch with one hand and door handle with other, lift with legs, eyes down.
Raise the door to between waist and shoulder height.
Switch ...
Set up Extendo (7)
Everyone must be clear of belt, stand to side of extendo.
While inside trailer, maintain 2 foot walk aisle between end of extendo and face of wa...
Have a set routine (6)
Face the work while standing at 45 degree angle to conveyor.
Maintain safe walkway to and from trailer.
Keep trailer floors clear of irregs a...
Select Package (7)
While removing a package from the wall, visually select the next package to unload.
Move directly from conveyor to the pre-selected package to a...
Unload sequence (9)
Using a load stand, select a package at the top, center to begin unloading.
Unload top left section first until packages are in power zone while...
Related Flashcard Decks
Study Tips
- Press F to enter focus mode for distraction-free studying
- Review cards regularly to improve retention
- Try to recall the answer before flipping the card
- Share this deck with friends to study together
Term | Definition |
---|---|
Job Setup (3) | Check equipment alignment to dock; must be flush to platform. |
When opening Overhead doors (10) | Grasp latch with one hand and door handle with other, lift with legs, eyes down. |
Set up Extendo (7) | Everyone must be clear of belt, stand to side of extendo. |
Have a set routine (6) | Face the work while standing at 45 degree angle to conveyor. |
Select Package (7) | While removing a package from the wall, visually select the next package to unload. |
Unload sequence (9) | Using a load stand, select a package at the top, center to begin unloading. |
Package Placement (5) | Place package on the conveyor label up or facing package flow. |
Maintain continuous flow (2) | When unloading to a roller conveyor, place packages back to back, squarely. |
Smalls handling (5) | Unload smalls bags as found in the load, do not store them. |
Irreg handling (1) | Maintain continuous flow by setting irregs against trailer wall until you can move them during a trip to rear of trailer or until inbound sweeper can remove them. |
Finish unloading (after each feeder) (3) | On completion of trailer, inspect floor for any remaining packages, smalls, overgoods, paper products, loose labels. |
Wrap up (end of day) (4) | Wrap-up starts at beginning of day. |