Q
QuestionArchitecture

What's the final step to install a floating vinyl plank floor? A. Glue planks to the underlayment B. Glue planks to the current floor C. Nail planks to the current floor D. Lay down planks, interlocking them with each other
21 days agoReport content

Answer

Full Solution Locked

Sign in to view the complete step-by-step solution and unlock all study resources.

Step 1
: Prepare the surface for installation by ensuring it is clean, dry, and level.

Remove any baseboards or trim if necessary.

Step 2
: Roll out the underlayment, cutting it to size and securing it to the subfloor according to the manufacturer's instructions.

Final Answer

Lay down planks, interlocking them with each other. This method ensures a secure and seamless installation without the need for adhesives or nails, allowing for easy replacement or repair of individual planks if needed.

Need Help with Homework?

Stuck on a difficult problem? We've got you covered:

  • Post your question or upload an image
  • Get instant step-by-step solutions
  • Learn from our AI and community of students

Related Questions

Architecture

11 days ago

How did flying buttresses help the primary goal of the Gothic architect?

·
View Answer

Architecture

11 days ago

Expansion of the ICS modular organization Is the responsibility of the?

·
View Answer

Architecture

11 days ago

"What did Louis Sullivan's designs emphasize? A. vertical lines using steel frames B. vertical lines using an open floor plan C. horizontal lines using an open floor plan"

·
View Answer

Architecture

15 days ago

"What are the four basic types of threaded fasteners? A. Hex Bolts, Machine Screws, Lag Screws, Wood Screws B. Hex Bolts, Sheet Metal Screws, Self-Tapping Screws, Lag Screws C. Nuts, Bolts, Washers, Threaded Rods D. Hex Bolts, Hex Nuts, Flat Washers, Lock Washers"

·
View Answer

Architecture

15 days ago

The word "facility" contains the root "fac." What does the root "fac" mean?

·
View Answer

Architecture

15 days ago

"Which of the following is the correct sequence for installing a bifold door? A. Measure the opening, attach the track, install the pivot brackets, and hang the door. B. Attach the track, measure the opening, install the pivot brackets, and hang the door. C. Hang the door, attach the track, install the pivot brackets, and measure the opening. D. Install the pivot brackets, measure the opening, attach the track, and hang the door."

·
View Answer