Energy barriers and remedies- India

A discussion on energy barriers faced by India, along with potential solutions to address these challenges.

Chloe Martinez
Contributor
4.7
39
5 months ago
Preview (3 of 9 Pages)
100%
Purchase to unlock

Page 1

Energy barriers and remedies- India - Page 1 preview image

Loading page image...

1Energy barriers andremedies-IndiaEnergy barriers and remedies-IndiaDiscuss the energy policy changes observed globally and the situation of energy resources inIndia, focusing on barriers to renewable energy adoption. How has the Indian governmentresponded to these barriers, andwhat measures have been taken to improve energy efficiencyand reduce energy shortages? (Word Count: 1200-1500 words)

Page 2

Energy barriers and remedies- India - Page 2 preview image

Loading page image...

Page 3

Energy barriers and remedies- India - Page 3 preview image

Loading page image...

2Energy barriers andremedies-IndiaIntroductionThe energy policy changes are observed during the globe in around in 1990. Energyregulations began to be started due to economic, security, environmental and security concernprevalent in the country. The policy changes started in the fields of renewable energy, whichcontains the incentives and reducing the barriers in this sector. These policiesincludeenergypromotionpolicies;transport bio fuels policies, emission reduction policies, distributedgeneration policies, electric power restructuring policies and rural electrification policies.Situation of IndiaCrude Oil-The oil consumption of India is3.182 million bbl/day (2010). The demand of oilis around 207 million tonnes in 2011-12. The domestic production in 2011-12 is only 39-40million tonnes(all the tables are taken fromplanningcommission). It can be found at alsohttp://www.spartastrategy.com/blog/2011/07/indias-energy-demand-and-supply-deficit2006-072007-082008-092009-102010-112011-12ONGC-27.1628.0029.0028.5327.37OIL-3.503.553.733.914.30Private/JV-10.5710.789.768.757.85Total33.9841.2342.3342.4941.1939.51Crude Oil ProductionEleventh Five-Year Plan Projections (Million tonnes)Liquid natural gasSupply-Eleventh Plan Period,Projected Natural Gas Demand (mms/cmd)2006-072007-082008-092009-102010-112011-12Dahej5.005.005.007.5010.0010.00Hazira2.502.502.502.502.502.50Dabhol-1.202.105.005.005.00Kochi----2.505.00Mangalore-----1.25Total7.508.709.6015.0020.0023.75Production-Eleventh Five-Year Plan ProjectionGas Production(bcm)2006-072007-082008-092009-102010-112011-12ONGC-22.1022.5322.7722.9922.00OIL-3.133.213.253.283.56Private/JV-8.5522.5529.4128.7737.61
Preview Mode

This document has 9 pages. Sign in to access the full document!

Study Now!

XY-Copilot AI
Unlimited Access
Secure Payment
Instant Access
24/7 Support
Document Chat

Document Details

Related Documents

View all