BUS 517: Project Management - Week 11 Final Exam

Final Exam for Project Management covering key concepts from Week 11.

Elijah Nelson
Contributor
4.9
54
5 months ago
Preview (2 of 6 Pages)
100%
Purchase to unlock

Page 1

BUS 517: Project Management - Week 11 Final Exam - Page 1 preview image

Loading page image...

BUS 517: Project Management-Week 11 Final ExamBUS 517 WK 11 Final Exam1. Information to develop a project network is collected from theA. Organization breakdown structureB. Work breakdown structureC. BudgetD. Project proposalE.Responsibility matrix2. Which of the following represents an activity on an AON project network?A. An arrowB. A lineC. A nodeD. Both A and B are correctE. A, B, and C are all correct3. Arrows on an AON project network represent:A. An activityB. Project flowC. DependencyD. Both B and C are correctE. Both A and B are correct4. When translated into a project network, a work package will becomeA. A single activityB. One or more activitiesC. A milestoneD. A critical pathE. An arrow5. Which of the following is provided by a project network but not by the work breakdownstructure?A. DependenciesB. SequencingC. InterrelationshipsD. Both A and B are correctE. A, B, and C are all correct6. On a project network, the activity times are derived from theA. Organization breakdown structureB. Work packagesC. BudgetD. Project proposalE. Responsibility matrix7. Part of a project is toDevelop Product Specifications. This is best classified as a(n)A. EventB. PathC. Activity

Page 2

BUS 517: Project Management - Week 11 Final Exam - Page 2 preview image

Loading page image...

Preview Mode

This document has 6 pages. Sign in to access the full document!

Study Now!

XY-Copilot AI
Unlimited Access
Secure Payment
Instant Access
24/7 Support
Document Chat

Document Details

Related Documents

View all