IICL Container Inspector's Pracice Exam with Answers (80 Solved Questions)

IICL Container Inspector's Pracice Exam with Answers lets you test yourself with actual exam-style questions.

Victoria Lee
Contributor
4.1
111
9 months ago
Preview (7 of 20 Pages)
100%
Purchase to unlock

Page 1

IICL Container Inspector's Pracice Exam with Answers (80 Solved Questions) - Page 1 preview image

Loading page image...

IICL Container Inspector's ExamSTUDYPLAYFlashcardsLearnWriteSpellTestMatchCreated byandrew_gentaTAGS RELATED TO THIS SETPeaks And ValleysRain GutterRegulationsTerms in this set (220)

Page 2

IICL Container Inspector's Pracice Exam with Answers (80 Solved Questions) - Page 2 preview image

Loading page image...

Page 3

IICL Container Inspector's Pracice Exam with Answers (80 Solved Questions) - Page 3 preview image

Loading page image...

Which of the followingdefects requires repair?A. A loose door gasketB. A bent J-bar that doesnot affect dooroperationC. A dent 13mm (1/2 in)deep on the door sillD. Four dents, each 11mm(7/16 in) deep, oncontiguous outboardcorrugations of a roofpanelA. A loose door gasketOf the followingconditions in a dry-vancontainer, which onewould require cleaning?A. Raised mud footprints in excess of whatmight normally remainafter a sweep outB. Dry dust coveringdried floor stains asmight normally be foundafter a sweep outC. Coffee beansremaining inside thecontainer as might occurafter a sweep outD. Polyurethane beadsas might be expected tolodge in groovesbetween floorboardsafter a sweep outC. Coffee beans remaining inside thecontainer as might occur after a sweep outWant to learn this setquickly?Use Quizlet’s activities andgames to make studying easy,effective and fun!FLASHCARDSLEARNMATCH

Page 4

IICL Container Inspector's Pracice Exam with Answers (80 Solved Questions) - Page 4 preview image

Loading page image...

An EquipmentInterchange Receipt(EIR), based on aninspection with nodamage found, can beevidence of a container'scompliance with: A.Australian TimberComponent TreatmentRegulations B.Convention for SafeContainers (CSC)regulations through theACEP ProgramC. Transport undercustom's seal (TIR)regulations D.International StandardsOrganization (ISO)CEDEX codesregulationsB. Convention for Safe Containers (CSC)regulations through the ACEP ProgramThe top of areplacement plasticventilator should becentered what distancefrom the top side rail? A.50-55mm (2-2 3/16 in) B.70-75mm (2 5/8 - 3 in)C. 100mm (4in) D. 150mm(6 in)A. 50-55mm (2-2 3/16 in)When must a referenceline extend the fulllength of a bottom siderail? A. When there areC. When there is a bowing over the entirebottom side rail

Page 5

IICL Container Inspector's Pracice Exam with Answers (80 Solved Questions) - Page 5 preview image

Loading page image...

two or more areas ofdamage on the bottomside rail B. When there isa sharp bend in thebottom side railC. When there is abowing over the entirebottom side rail D. Whenthere is additionaldamage to the bottomside rail so that thereference line cannot bepositioned over the endsof the damageWhich of the following isNOT a transversestructural member of thecontainer?A. Front sill B. Tunnel railC. Rear headerD. CrossmemberB. Tunnel railA steel corner fitting isbeing replaced. Toensure better weldpenetration, IICLrecommends that theedges of parts adjacentto the corner fitting beground to a minimumbevel of? A. 30 degreesB. 45 degreesC. 55 degrees D. 60degreesB. 45 degrees

Page 6

IICL Container Inspector's Pracice Exam with Answers (80 Solved Questions) - Page 6 preview image

Loading page image...

Which of the followingcomponents issometimes placedlongitudinally in thecontainer to supportplywood flooring? A.Transverse bow B.GussetC. Hat section centerspacerD. Threshold plateC. Hat section center spacerAssuming owner andenvironmentalregulations permit, whichof the followingprocedures is NOTrecommended forrepairing tarpaulins oropen top containers? A.Cleaning the area to becovered with acetone ormineral spirit B. Using aheat gun to fuse a patchto the tarpaulin C.Sewing on a patch of thesame material as thetarpaulin D. Repairing a 6mm (1/4 in ) pin hole withan epoxy compoundC. Sewing on a patch of the same materialas the tarpaulinWhich of the following isan example of a plankfloor condition requiringrepair AND which shouldC. A crack or split, adjacent to a dentedbottom rail, which leaks light

Page 7

IICL Container Inspector's Pracice Exam with Answers (80 Solved Questions) - Page 7 preview image

Loading page image...

be considered asdamage?A. A crack or split withno evidence of impact,which leaks lightB. A crack or split with asign of impact whichdoes not leak lightC. A crack or split,adjacent to a dentedbottom rail, which leakslightD. A crack or split, withno evidence of impact,with a loose pieceWelds to corner fittingsshould be made with?A. CO2 semi-automaticweldingB. Low hydrogenwelding rodsC. Fully automaticweldingD. Arc weldingB. Low hydrogen welding rodsAll of the followingprocedures are requiredEXCEPTA. Weld smoke, spatter,etc. must be removed topermit adhesion of paintB. The damagedcomponent(s) must berestored as close aspossible to original sizeC. Welds must be examined usingradiographic or magnetic particle non-destructive testing equipment
Preview Mode

This document has 20 pages. Sign in to access the full document!

Study Now!

XY-Copilot AI
Unlimited Access
Secure Payment
Instant Access
24/7 Support
Document Chat

Document Details

Related Documents

View all