BUS 644 Week 6 Final Paper Space Age Furniture Problem

Final paper solution for a business course.

Finn Hill
Contributor
4.5
35
about 1 month ago
Preview (4 of 11)
Sign in to access the full document!
BUS 644 Week 6 Final Paper Space Age Furniture Problem
University Name
In the case of Space Age Furniture Company, the operations manager Coral must address
the challenge of producing 2,000 units of part 3079 without requiring overtime from the skilled
operator, Ed. Discuss the effectiveness of the production smoothing strategy, the possibility of
hiring an additional operator, and the impact of inventory space costs on profitability. Evaluate
the advantages and disadvantages of these strategies and propose the most efficient solution for
the company to meet customer demand while minimizing costs. (Minimum 750 words)
Read “Space Age Furniture Company” in Chapter 9 of your text. Respond to the following and
include any Materials Requirement Planning (MRP) calculations:
a. Develop an MRP for Space Age Furniture Company using the information in the case including
the production of sub-assemblies in lot sizes of 1,000.
b. The lot size of 1,000 for sub-assemblies has produced a lumpy demand for part 3079. Suggest
ways for improvements over sub-assemblies in lot sizes of 1,000.
c. Analyze the trade-off between overtime costs and inventory costs.
d. Calculate a new MRP that improves the base MRP.
e. Compare and contrast the types of production processingjob shop, batch, repetitive, or
continuousand determine which the primary mode of operation is and why.
f. Describe ways that management can keep track of job status and location during production.
g. Recommend any changes that might be beneficial to the company and/or add value for the
custome
Abstract
The Space Age Furniture Company appropriated a requisition of 1000 Gemini furniture pieces
and an alternate for 1000 Saturn furniture pieces. The unit that will generate they said units is
equipped for gathering the handling of the requested products, however the quandary is the
accessibility of a gifted worker who can proficiently work the extraordinary machine required in
the processing of a particular part to finish an unit. The main mechanic of the organization can
prepare 30 bits of said part in a hour, 240 pieces in a general 8 hour work day, or what added up
to 1,200 pieces in a 5 working days for every week. Anyhow to take care of the demand of the
customer for a particular date of conveyance, 2,000 units must be made in one week. Ed, the
main gifted machine admin is hesitant to work more extra minutes. In this way, the furniture
organization is confronted with the issue of conveying the requested units asked for by the
customer on a particular date and influencing Ed to work additional minutes throughout the
whole weeks of processing. The organization has one week lead opportunity to transform both
requested items.
Space Age Furniture Problem
Struggling to meet the client satisfaction, by effectively balancing production of goods
with employee contentment is always a problem to producers of goods. Take the case of Space
Age Furniture Company. The company has only one machine operator who can operate the
special lathe that will produce part number 3079 needed in the completion of both Genesis 425
and Saturn 257, part 3079 is essential in the production of both commissioned products. But this
essential part is only produced by the special lathe which only Ed can skillfully operate. With Ed
opting to work the regular shift, 8 hours in five regular working days, only 1,200 pieces will be
made in a week. But with the higher demand for the products and the time element included in
the order, more of part 3079 must be produced per day which would translate to overtime work
for Ed, if he agrees to it. Hiring another machinist to take over the production after Ed’s shift
ends, may yet solve the problem but the special lathe requires a highly skilled operator like Ed,
to work it efficiently, and not a lot of Ed’s caliber can be immediately hired to do the work.
Another alternative is a training anew operator, but that will not be good option, considering that
the new recruit may not turn out to be as skilled as Ed.
With Coral, the operations manager of the company is tasked to address the problem of
solving the timely and efficient production of the specific part without the burden of overtime to
the only available operator of the lathe” (Gallego G, 2011)
Preview Mode

Sign in to access the full document!

100%

Study Now!

XY-Copilot AI
Unlimited Access
Secure Payment
Instant Access
24/7 Support
Document Chat

Document Details

University
Ashford University
Subject
Business Management

Related Documents

View all