Solution Manual for Analysis, Synthesis, and Design of Chemical Processes, 5th Edition

Get the textbook answers you need with Solution Manual for Analysis, Synthesis, and Design of Chemical Processes, 5th Edition, an essential guide to solving textbook problems.

Sarah Anderson
Contributor
4.3
54
5 months ago
Preview (16 of 634 Pages)
100%
Purchase to unlock

Loading document content...

Preview Mode

Sign in to access the full document!

Solution Manual for Analysis, Synthesis, and Design of Chemical Processes, 5th Edition

Page 1

Solution Manual for Analysis, Synthesis, and Design of Chemical Processes Fifth Edition Richard Turton Joseph A. Shaeiwitz Debangsu Bhattacharyya Wallace B. Whiting

Page 2

Page 3

1-1 CHAPTER 1 SHORT ANSWER QUESTIONS 1.1 Block Flow Diagram (BFD) Process Flow Diagram (PFD) Piping and Instrument Diagrams (P&ID) (a) PFD (b) BFD (c) PFD or P&ID (d) P&ID (e) P&ID 1.2 P&ID 1.3 It is important for a process engineer to be able to review a 3-dimensional model prior to the construction phase to check for clearance, accessibility, and layout of equipment, piping, and instrumentation. 1.4 Things that would affect the locations of different pieces of equipment when determining the layout of equipment in a process unit (1) Clearance for tube bundle removal on a heat exchanger. (2) NPSH on a pump affects the vertical separation of feed vessel and pump inlet. (3) Accessibility of an instrument for an operator must be able to read a PI or change/move a valve. (4) Separation between equipment for safety reasons reactors and compressors. (5) Crane access for removing equipment. (6) Vertical positioning of equipment to allow for gravity flow of liquid. (7) Hydrostatic head for thermosiphon reboiler affects height of column skirt. 1.5 Why are accurate plant models (made of plastic parts) no longer made as part of the design process? What function did these models play and how is this function now achieved? Plastic models are no longer made because they are too expensive and difficult to change/revise. These models have been replaced with virtual/e-models using 3-D CAD. Both types of model allow revision of critical equipment and instrument placement to ensure access, operability, and safety. 1.6 OTS = Operator Training Simulator ITS = Immersive Training Simulator

Page 4

1-2 1.7 Augmented reality refers to a feature of an immersive training system (ITS) where by an operator can obtain additional information about equipment by “peeling back” the wall of a vessel, etc., and looking inside the equipment. 1.8 What are the two principle methods for the layout of process equipment in a chemical plant? (a) Grade-Mounted, Horizontal, In-line Arrangement and (b) Structure-Mounted Vertical Arrangement 1.9 When is it appropriate to add a flag to a stream in a PFD rather than including the stream in the stream flow table? When only temperature or pressure changes in the equipment. So for example at the outlet of a pump or the outlet of a heat exchanger. Flags should also be considered around critical equipment for example reactors. 1.10 What problems would you foresee in naming equipment in a process that had a unit number of 10 (for example, pumps starting with P-11, P-12, etc.)? By having a unit number with only 2 digits (10, 20, 30, etc.), the maximum number of equipment items within an equipment class is 9. For example, pump 11 in unit 20 would become P-31, which could be in conflict with the first pump of unit 30. By numbering units in the hundreds (200, 300, etc.), the maximum number of items in an equipment class is 99 so there will never be a conflict of this type. 1.11 What diagram would you refer to in order to estimate the frictional loss through a certain piping run within a process? This would require a piping isometric(s) for the whole piping run. 1.12 In the vast majority of cases what is the final control element in a process control loop? Nearly always, this control element will be a control valve. 1.13 What is the most effective way of communicating information about a process? Through the use of diagrams (or computer generated models) but always a visual representation. 1.14 Vessel V-307 is to be replaced in a plant with a vessel that is designed to withstand a higher pressure and which has a larger volume. Should this vessel be numbered V-307 to correspond with the vessel it is replacing? Explain your answer. Generally, the answer is No. Unless the replacement equipment is essentially identical in function and characteristics to the original equipment a new number should be chosen to avoid confusion when locating information about the equipment. For the case considered in this question, calling the vessel V-307A would probably be ok.

Page 5

1-3 PROBLEMS 1.15 There are two common reasons for elevating the bottom of a tower by means of a “skirt.” One reason is to provide enough NPSH A for bottoms product pumps to avoid cavitation. What is the other reason? Another reason to elevate the bottom of a tower is to provide enough hydrostatic head driving force to operate a thermosiphon reboiler 1.16 (a) PFD or P&ID (b) PFD (c) PFD (d) P&ID (e) BFD (or all PFDs) 1.17 A pipe rack provides a clear path for piping within and between processes. It keeps piping off the ground to eliminate tripping hazards and elevates it above roads to allow vehicle access. 1.18 A structure mounted vertical plant layout is preferred when land is at a premium and the process must have a small foot print. The disadvantage is that it is more costly because of the additional structural steel. 1.19 (a) BFD - No change PFD - Efficiency changed on fired heater, resize any heat exchanger used to extract heat from the flue gas (economizer) P&ID - Resize fuel and combustion air lines and instrumentation for utilities to fired heater. Changes for design changed of economizer (if present) (b) BFD - Change flow of waste stream in overall material balance PFD - Change stream table P&ID Change pipe size and any instrumentation for this process line (c) BFD - No change PFD - Add a spare drive, e.g. D- 301 → D -301 A/B P&ID - Add parallel drive (d) BFD - No change PFD - No change P&ID - Note changes of valves on diagram 1.20 (a) A new vessel number need not be used, but it would be good practice to add a letter to donate a new vessel, e.g. V- 203 → V -203N. This will enable an engineer to locate the new process vessel sheet and vendor information. (b) P&ID definitely PFD change/add the identifying letter.

Page 6

1-4 1.21 Solution to Problem 1.21 1.22 (a) (i) Open globe valve d (ii) Shut off gate valves a and c (iii) Open gate valve e and drain contents of isolated line to sewer (iv) Perform necessary maintenance on control valve b (v) Reconnect control valve b and close gate valve e (vi) Open gate valves a and c (vii) Close globe valve d (b) Drain from valve e can go to regular or oily water sewer. (c) Replacing valve d with a gate valve would not be a good idea because we loose the ability to control the flow of process fluid during the maintenance operation. (d) If valve d is eliminated then the process must be shut down every time maintenance is required on the control valve.

Page 7

1-5 1.23 1.24 Solution to Problem 1.23 Solution to Problem 1.24

Page 8

1-6 1.25 (a) For a pump with a large NPSH, the vertical distance between the feed vessel and the pump inlet must be large in order to provide the static head required to avoid cavitating the pump. (b) Place the overhead condenser vertically above the reflux drum, the bottom shell outlet on the condenser should feed directly into the vertical drum. (c) Pumps and control valves should always be placed either at ground level (always for pumps) or near a platform (sometimes for control valves) to allow access for maintenance. (d) Arrange shell and tube exchangers so that no other equipment or structural steel impedes the removal of the bundle. (e) This is why we have pipe racks never have pipe runs on the ground. Always elevate pipes and place on rack. (f) Locate plant to the east of major communities.

Page 9

1-7 1.26 HT area of 1 tube 2 1 = = ( )(12ft)=3.142ft 12 DL Number of tubes 2 2 2 3.2808ft 1 =(145m ) 497 m 3.142ft       tubes Use a 1¼-inch square pitch Fractional area of the tubes 2 1 = =0.5027 4 1.25   2 2 2 =(4)(777)=3108in =3108in 4 SHELL SHELL CSA D 2 (4)(3108in ) 62.9in 1.598m SHELL D Length of Heat Exchanger = (2 + 12 + 2) ft = 16 ft = 4.877 m Foot Print = 1.598 × 4.877 m

Page 10

1-8 1.27 From Table 1.11 towers and reactors should have a minimum separation of 15 feet or 4.6 m and no other restrictions apply. See sketch for details. Solution to Problem 1.27

Page 11

1-9 1.28

Page 12

1-10 1.29 1.30 (a) A temperature (sensing) element (TE) in the plant is connected via a capillary line to a temperature transmitter (TT) also located in the plant. The TT sends an electrical signal to temperature high (TAH) and temperature low (TAL) alarms located on the front of a panel in the control room. (b) A level switch (L S) located in the plant sends an electrical signal to … (c) A pressure control valve (LCV) located in the plant is connected by a pneumatic (air) line to the stem of a control valve. (d) A local flow indicator (FI) is attached to a flow orifice both instruments are located in the plant. (e) A safety (pressure) relief valve is shown attached to two process lines. The top process line appears to vent to atmosphere but could be attached to a flare system there is not enough information to determine this based on the sketch provided. 5 m

Page 13

1-11 1.31 1.32

Page 14

1-12 1.33 1.34

Page 15

2-1 CHAPTER 2 SHORT ANSWER PROBLEMS 2.1 The five elements of the Hierarchy of Process Design are: (a) Batch or continuous process (b) Input-output structure of process (c) Recycle structure of process (d) General separation structure of process e. Heat-exchanger network/process energy recovery 2.2 (a) Separate/purify unreacted feed and recycle use when separation is feasible. (b) Recycle without separation but with purge when separation of unused reactants is infeasible/uneconomic. Purge is needed to stop build-up of product or inerts. (c) Recycle without separation or purge product/byproduct must react further through equilibrium reaction. 2.3 Batch preferred over continuous when: small quantities required, batch-to-batch accountabilities required, seasonal demand for product or feed stock availability, need to produce multiple products using the same equipment, very slow reactions, and high equipment fouling. 2.4 One example is the addition of steam to a catalytic reaction using hydrocarbon feeds. Examples are given in Appendix B (styrene, acrylic acid.) In the styrene process, superheated steam is added to provide energy for the desired endothermic reaction and to force the equilibrium towards styrene product. In the acrylic acid example, steam is added to the feed of propylene and air to act as thermal ballast (absorb the heat of reaction and regulate the temperature), and it also serves as an anti-coking agent that prevents/supresses the coking reactions that deactivate the catalyst.

Page 16

2-2 2.5 Reasons for purifying a feed material prior to feeding it to a process include: (a) If the impurity fouls or poisons a catalyst used in the process. e.g., remove trace sulfur compounds in natural gas prior to sending it to a steam reforming reactor to produce hydrogen. (b) If impurities react to form difficult-to-separate or hazardous products/byproducts. e.g. Production of isocyanates using phosgene. Production of phosgene is CO + Cl 2 COCl 2 The carbon monoxide is formed via steam reforming of CH 4 to give CO + H 2 . H 2 must be removed from CO prior to reaction with Cl 2 to form HCl, which is highly corrosive and causes many problems in the downstream processes. (c) If the impurity is present in large quantities then it may be better to remove the impurity rather than having to size all the down stream equipment to handle the large flow of inert material. e.g. One example is using oxygen rather than air to fire a combustion or gasification processes. Removing nitrogen reduces equipment size and makes the removal of CO 2 and H 2 S much easier because these species are more concentrated.
Solution Manual for Analysis, Synthesis, and Design of Chemical Processes Fifth Edition Richard Turton Joseph A. Shaeiwitz Debangsu Bhattacharyya Wallace B. Whiting 1-1 CHAPTER 1 SHORT ANSWER QUESTIONS 1.1 Block Flow Diagram (BFD) Process Flow Diagram (PFD) Piping and Instrument Diagrams (P&ID) (a) PFD (b) BFD (c) PFD or P&ID (d) P&ID (e) P&ID 1.2 P&ID 1.3 It is important for a process engineer to be able to review a 3-dimensional model prior to the construction phase to check for clearance, accessibility, and layout of equipment, piping, and instrumentation. 1.4 Things that would affect the locations of different pieces of equipment when determining the layout of equipment in a process unit (1) Clearance for tube bundle removal on a heat exchanger. (2) NPSH on a pump affects the vertical separation of feed vessel and pump inlet. (3) Accessibility of an instrument for an operator must be able to read a PI or change/move a valve. (4) Separation between equipment for safety reasons reactors and compressors. (5) Crane access for removing equipment. (6) Vertical positioning of equipment to allow for gravity flow of liquid. (7) Hydrostatic head for thermosiphon reboiler affects height of column skirt. 1.5 Why are accurate plant models (made of plastic parts) no longer made as part of the design process? What function did these models play and how is this function now achieved? Plastic models are no longer made because they are too expensive and difficult to change/revise. These models have been replaced with virtual/e-models using 3-D CAD. Both types of model allow revision of critical equipment and instrument placement to ensure access, operability, and safety. 1.6 OTS = Operator Training Simulator ITS = Immersive Training Simulator 1-2 1.7 Augmented reality refers to a feature of an immersive training system (ITS) where by an operator can obtain additional information about equipment by “peeling back” the wall of a vessel, etc., and looking inside the equipment. 1.8 What are the two principle methods for the layout of process equipment in a chemical plant? (a) Grade-Mounted, Horizontal, In-line Arrangement and (b) Structure-Mounted Vertical Arrangement 1.9 When is it appropriate to add a flag to a stream in a PFD rather than including the stream in the stream flow table? When only temperature or pressure changes in the equipment. So for example at the outlet of a pump or the outlet of a heat exchanger. Flags should also be considered around critical equipment for example reactors. 1.10 What problems would you foresee in naming equipment in a process that had a unit number of 10 (for example, pumps starting with P-11, P-12, etc.)? By having a unit number with only 2 digits (10, 20, 30, etc.), the maximum number of equipment items within an equipment class is 9. For example, pump 11 in unit 20 would become P-31, which could be in conflict with the first pump of unit 30. By numbering units in the hundreds (200, 300, etc.), the maximum number of items in an equipment class is 99 so there will never be a conflict of this type. 1.11 What diagram would you refer to in order to estimate the frictional loss through a certain piping run within a process? This would require a piping isometric(s) for the whole piping run. 1.12 In the vast majority of cases what is the final control element in a process control loop? Nearly always, this control element will be a control valve. 1.13 What is the most effective way of communicating information about a process? Through the use of diagrams (or computer generated models) – but always a visual representation. 1.14 Vessel V-307 is to be replaced in a plant with a vessel that is designed to withstand a higher pressure and which has a larger volume. Should this vessel be numbered V-307 to correspond with the vessel it is replacing? Explain your answer. Generally, the answer is No. Unless the replacement equipment is essentially identical in function and characteristics to the original equipment a new number should be chosen to avoid confusion when locating information about the equipment. For the case considered in this question, calling the vessel V-307A would probably be ok. 1-3 PROBLEMS 1.15 There are two common reasons for elevating the bottom of a tower by means of a “skirt.” One reason is to provide enough NPSH A for bottoms product pumps to avoid cavitation. What is the other reason? Another reason to elevate the bottom of a tower is to provide enough hydrostatic head driving force to operate a thermosiphon reboiler 1.16 (a) PFD or P&ID (b) PFD (c) PFD (d) P&ID (e) BFD (or all PFDs) 1.17 A pipe rack provides a clear path for piping within and between processes. It keeps piping off the ground to eliminate tripping hazards and elevates it above roads to allow vehicle access. 1.18 A structure mounted vertical plant layout is preferred when land is at a premium and the process must have a small foot print. The disadvantage is that it is more costly because of the additional structural steel. 1.19 (a) BFD - No change PFD - Efficiency changed on fired heater, resize any heat exchanger used to extract heat from the flue gas (economizer) P&ID - Resize fuel and combustion air lines and instrumentation for utilities to fired heater. Changes for design changed of economizer (if present) (b) BFD - Change flow of waste stream in overall material balance PFD - Change stream table P&ID Change pipe size and any instrumentation for this process line (c) BFD - No change PFD - Add a spare drive, e.g. D- 301 → D -301 A/B P&ID - Add parallel drive (d) BFD - No change PFD - No change P&ID - Note changes of valves on diagram 1.20 (a) A new vessel number need not be used, but it would be good practice to add a letter to donate a new vessel, e.g. V- 203 → V -203N. This will enable an engineer to locate the new process vessel sheet and vendor information. (b) P&ID definitely PFD change/add the identifying letter. 1-4 1.21 Solution to Problem 1.21 1.22 (a) (i) Open globe valve d (ii) Shut off gate valves a and c (iii) Open gate valve e and drain contents of isolated line to sewer (iv) Perform necessary maintenance on control valve b (v) Reconnect control valve b and close gate valve e (vi) Open gate valves a and c (vii) Close globe valve d (b) Drain from valve e can go to regular or oily water sewer. (c) Replacing valve d with a gate valve would not be a good idea because we loose the ability to control the flow of process fluid during the maintenance operation. (d) If valve d is eliminated then the process must be shut down every time maintenance is required on the control valve. 1-5 1.23 1.24 Solution to Problem 1.23 Solution to Problem 1.24 1-6 1.25 (a) For a pump with a large NPSH, the vertical distance between the feed vessel and the pump inlet must be large in order to provide the static head required to avoid cavitating the pump. (b) Place the overhead condenser vertically above the reflux drum, the bottom shell outlet on the condenser should feed directly into the vertical drum. (c) Pumps and control valves should always be placed either at ground level (always for pumps) or near a platform (sometimes for control valves) to allow access for maintenance. (d) Arrange shell and tube exchangers so that no other equipment or structural steel impedes the removal of the bundle. (e) This is why we have pipe racks never have pipe runs on the ground. Always elevate pipes and place on rack. (f) Locate plant to the east of major communities. 1-7 1.26 HT area of 1 tube 2 1 = = ( )(12ft)=3.142ft 12 DL   Number of tubes 2 2 2 3.2808ft 1 =(145m ) 497 m 3.142ft              tubes Use a 1¼-inch square pitch ⇒ Fractional area of the tubes 2 1 = =0.5027 4 1.25        2 2 2 =(4)(777)=3108in =3108in 4 SHELL SHELL CSA D   2 (4)(3108in ) 62.9in 1.598m SHELL D     Length of Heat Exchanger = (2 + 12 + 2) ft = 16 ft = 4.877 m Foot Print = 1.598 × 4.877 m 1-8 1.27 From Table 1.11 towers and reactors should have a minimum separation of 15 feet or 4.6 m and no other restrictions apply. See sketch for details. Solution to Problem 1.27 1-9 1.28 1-10 1.29 1.30 (a) A temperature (sensing) element (TE) in the plant is connected via a capillary line to a temperature transmitter (TT) also located in the plant. The TT sends an electrical signal to temperature high (TAH) and temperature low (TAL) alarms located on the front of a panel in the control room. (b) A level switch (L S) located in the plant sends an electrical signal to … (c) A pressure control valve (LCV) located in the plant is connected by a pneumatic (air) line to the stem of a control valve. (d) A local flow indicator (FI) is attached to a flow orifice both instruments are located in the plant. (e) A safety (pressure) relief valve is shown attached to two process lines. The top process line appears to vent to atmosphere but could be attached to a flare system – there is not enough information to determine this based on the sketch provided. 5 m 1-11 1.31 1.32 1-12 1.33 1.34 2-1 CHAPTER 2 SHORT ANSWER PROBLEMS 2.1 The five elements of the Hierarchy of Process Design are: (a) Batch or continuous process (b) Input-output structure of process (c) Recycle structure of process (d) General separation structure of process e. Heat-exchanger network/process energy recovery 2.2 (a) Separate/purify unreacted feed and recycle use when separation is feasible. (b) Recycle without separation but with purge when separation of unused reactants is infeasible/uneconomic. Purge is needed to stop build-up of product or inerts. (c) Recycle without separation or purge product/byproduct must react further through equilibrium reaction. 2.3 Batch preferred over continuous when: small quantities required, batch-to-batch accountabilities required, seasonal demand for product or feed stock availability, need to produce multiple products using the same equipment, very slow reactions, and high equipment fouling. 2.4 One example is the addition of steam to a catalytic reaction using hydrocarbon feeds. Examples are given in Appendix B (styrene, acrylic acid.) In the styrene process, superheated steam is added to provide energy for the desired endothermic reaction and to force the equilibrium towards styrene product. In the acrylic acid example, steam is added to the feed of propylene and air to act as thermal ballast (absorb the heat of reaction and regulate the temperature), and it also serves as an anti-coking agent that prevents/supresses the coking reactions that deactivate the catalyst. 2-2 2.5 Reasons for purifying a feed material prior to feeding it to a process include: (a) If the impurity fouls or poisons a catalyst used in the process. e.g., remove trace sulfur compounds in natural gas prior to sending it to a steam reforming reactor to produce hydrogen. (b) If impurities react to form difficult-to-separate or hazardous products/byproducts. e.g. Production of isocyanates using phosgene. Production of phosgene is CO + Cl 2 → COCl 2 The carbon monoxide is formed via steam reforming of CH 4 to give CO + H 2 . H 2 must be removed from CO prior to reaction with Cl 2 to form HCl, which is highly corrosive and causes many problems in the downstream processes. (c) If the impurity is present in large quantities then it may be better to remove the impurity rather than having to size all the down stream equipment to handle the large flow of inert material. e.g. One example is using oxygen rather than air to fire a combustion or gasification processes. Removing nitrogen reduces equipment size and makes the removal of CO 2 and H 2 S much easier because these species are more concentrated.

Study Now!

XY-Copilot AI
Unlimited Access
Secure Payment
Instant Access
24/7 Support
Document Chat

Document Details

Related Documents

View all