Active Directory Proposal Plan

Proposal outlining the implementation of an Active Directory infrastructure.

Lucas Allen
Contributor
4.3
38
5 months ago
Preview (3 of 9 Pages)
100%
Purchase to unlock

Page 1

Active Directory Proposal Plan - Page 1 preview image

Loading page image...

Active DirectoryProposal PlanFor ECPI EMRName of the Student5/16/2015Given the Active Directory (AD) plan proposed for ECPI EMR, describe the key elements of thedisaster recovery plan and its implementation. How does cloudcomputing play a role in ensuringdata continuity and recovery during a disaster? Additionally, explain the importance of hardwareand software compatibility across the remote offices and the steps taken to ensure seamlessintegration.Word Count Requirement: 500-600 words

Page 2

Active Directory Proposal Plan - Page 2 preview image

Loading page image...

Page 3

Active Directory Proposal Plan - Page 3 preview image

Loading page image...

Active Directory PlanforECPI EMRThe growth of Information Technology is resulting into the transition of paper work toelectronic record systems. The technology is making a huge impact on healthcare industry aswell. In this paper, an AD structure is proposed for ECPI EMR. In this project different healthorganizations are joining as a group and are ready to have a transition in the electronic world.Anaction plan for this transition is proposed in the paper through timeline, physical & logical designof AD, etc.A disaster recovery planis also proposed to take care of the disaster scenarios. In allthe remote offices, astandalone server isinstalled.EMR are very sensitive and are prone toissues like security and privacy therefore, aT-1 lineis usedamong the routes ofcentral office&otherremote officesto form a stable state.The requirements tend to change with time and sodoes input and output format. Considering this requirement, the installation as well asmanagement of software is done through a centralized location.To manage the security ofsoftware and its access rights, digital certificates are used. This will help in controlling theauthorization access of the employees and also to troubleshoot the issues if required.TimelineWeek 1All the requirements will be gathered by the installation team.Week 2Requirements will be verified with the hardware requirements. The requiredhardware & software will be checked if it meets the requirement.Week 3The physical area for setting up the servers will be prepared. The required thingswill be purchased as per the need.TheHardwarewill be installed and verified through the experiencedprofessionals.The requiredSoftwarewill be installed and configured as per the specifications.Week 4Cooling system will be installed so that the resources can work in a smoothmanner.Week 5Production Rollout of the project
Preview Mode

This document has 9 pages. Sign in to access the full document!

Study Now!

XY-Copilot AI
Unlimited Access
Secure Payment
Instant Access
24/7 Support
Document Chat

Document Details

Related Documents

View all