CISS 120 Spring 2015 Final Exam

Final exam covering fundamental concepts in Information Technology and information systems.

Michael Davis
Contributor
4.8
44
5 months ago
Preview (2 of 5 Pages)
100%
Purchase to unlock

Loading document content...

Preview Mode

Sign in to access the full document!

CISS 120 Spring 2015 Final Exam

Page 1

Spring 2015 CISS 120 Final Exam For the CISS 120 final lab, you are asked to design and configure a network that includes subnetting, VLAN creation, InterVLAN routing, and OSPF dynamic routing. Explain how you would: 1. Subnet the 10.10.1.0/24 network for the required LANs and point - to - point connections. 2. Configure VLANs and routing for the Branch LANs. 3. Implement OSPF routing between HQ, Central, and Branch, and configure necessary static routes. Word Count Requirement: 400 - 500 words

Page 2

Spring 2015 CISS 120 Final Exam For the CISS 120 final lab, you are asked to design and configure a network that includes subnetting, VLAN creation, InterVLAN routing, and OSPF dynamic routing. Explain how you would: 1. Subnet the 10.10.1.0/24 network for the required LANs and point - to - point connections. 2. Configure VLANs and routing for the Branch LANs. 3. Implement OSPF routing between HQ, Central, and Branch, and configure necessary static routes. Word Count Requirement: 400 - 500 words

Study Now!

XY-Copilot AI
Unlimited Access
Secure Payment
Instant Access
24/7 Support
Document Chat

Related Documents

View all