Consultant�s Analysis Report on Enterprise System: IT401-1501A-02 Information Technology Architectures

Consultant report analyzing an enterprise system, covering IT architectures.

James Carter
Contributor
5.0
34
about 1 month ago
Preview (4 of 10)
Sign in to access the full document!
Running head: Consultant’s Analysis Report on Enterprise System 1
Consultant’s Analysis Report on Enterprise System
IT401-1501A-02 Information Technology Architectures
1/29/2015
Evaluate the Consultant’s Analysis Report on Enterprise Systems, focusing on the architecture
selection process, personnel requirements, and timeline for the system implementation. How do
these elements align with the needs of a large organization, such as M&T Bank, and how might
they impact the efficiency and scalability of the enterprise system? Your response should be
between 600-800 words.
Consultant’s Analysis Report on Enterprise System 2
Abstract
The project outline discusses the development of a comprehensive document entitled
Consultant’s Analysis Report on Enterprise Systems .In this process of the project, it entails the
overall basis of the plan of the enterprise system. In context, it will also produce the shell
document for the finalized project deliverable that will be worked on during each unit.
Appropriate research should be conducted to support the analysis in the design and a thesis may
be created when essential.
Table of Contents
Abstract......................................................................................................................................................... 2
Consultant’s Analysis Report on Enterprise System .................................................................................... 4
System Requirements.................................................................................................................................... 4
Architecture Selection................................................................................................................................... 4
Client and Server distributed systems........................................................................................................... 4
Shared model system. ................................................................................................................................... 5
Distributed Object..................................................................................................................................... 5
Selection.................................................................................................................................................... 6
Justification............................................................................................................................................... 6
Resources and Timeline................................................................................................................................ 7
Personnel Requirements and Staffing ................................................................................................... 7
Training of Staff.................................................................................................................................... 7
Timeline ........................................................................................................................................................ 8
Phase Four Level One Heading .................................................................................................................... 9
Preview Mode

Sign in to access the full document!

100%

Study Now!

XY-Copilot AI
Unlimited Access
Secure Payment
Instant Access
24/7 Support
Document Chat

Document Details

University
Kaplan University School of Business and Management
Subject
Information Technology

Related Documents

View all